Regional Bank Branch Refresh Across 140 Sites

The branch edge had reached end of software support and the estate had drifted into four different router models bought across eight years

Client Background

Who The Client Is

A regional banking group operating 140 branches across three countries with a two person central network team

Project Challenge

The Constraint That Mattered

The branch edge had reached end of software support and the estate had drifted into four different router models bought across eight years

Customer Pain Points

What Was Actually Going Wrong

  • Four hardware variants meant four config templates and four spare pools
  • Change windows were limited to Sunday mornings which capped the rollout rate
  • Compliance required serial level asset records that the existing register could not produce

Our Solution

What We Did About It

One branch router and one access switch model were selected and held for the whole programme. Hardware was packed per branch rather than per part number so each Sunday crew received a single carton.

Manufacturing And Process

How The Work Was Sequenced

  1. 1

    Estate audit produced a single list of deployed part numbers and support status

  2. 2

    Target standard fixed and stock allocated for the full 140 site quantity up front

  3. 3

    Branch kits assembled with router switch optics rails and patch leads in one carton

  4. 4

    Consignments released weekly against the change window calendar

Supply Chain Coordination

How Supply Risk Was Removed

Stock was allocated in a single block so the price held for eighteen months and no site was exposed to a mid programme discontinuation

Quality Control

What Was Checked On Every Unit

Every unit was seal checked serial recorded and bench powered with the software version reported before packing

Final Result

Outcome

All 140 branches were migrated inside eleven months with no window missed for hardware reasons

Customer Benefit

What Changed Afterwards

One template one spare pool and an asset register that reconciles to the serial lists issued per consignment

Related Products

Products Used in This Programme

ISR4221/K9 Cisco Router ISR 4000

Cisco Router ISR 4000

ISR4221/K9

Cisco 4221 Integrated Services router is design to deliver advanced services to the small enterprise branch environment. It delive

ISR4321-AX/K9 Cisco Router ISR 4000

Cisco Router ISR 4000

ISR4321-AX/K9

ISR4321-AX/K9 intelligent WAN bundle combines security features, application experience and Wide Area Application Services (WAAS)

ISR4321-AXV/K9 Cisco Router ISR 4000

Cisco Router ISR 4000

ISR4321-AXV/K9

Cisco 4321 Integrated Services router is design to deliver advanced services to the small enterprise branch environment. It delive

ISR4321-SEC/K9 Cisco Router ISR 4000

Cisco Router ISR 4000

ISR4321-SEC/K9

Cisco ISR4321-SEC/K9 is the Cisco ISR4321/k9 router with Security Bundle. Its other specifications are the same as ISR4321/k9.

Run a Programme Like This

Send the site count timeline and documentation requirement and we will map the supply plan against it

No forms No sign up Replies within one working day

FAQ

Questions About This Project

Could You Deliver a Programme Like This for Us

Yes. The shape transfers directly. What changes is the site count the change window rules and the documentation format your audit requires.

How Far Ahead Should We Start

For a multi wave programme start the availability and allocation conversation before the standard is fixed. That is the point where a discontinuation is cheap to design around.

What Held the Price Stable

Allocating programme quantity up front. Once stock is positioned against an agreed quantity the price is no longer exposed to spot movement.

Do You Pack per Site

Yes. Packing per site rather than per part number is normal on multi site work and is usually the single biggest saving on install labour.

How Were Serial Records Handled

Serial lists were issued per consignment in a format the client asset register could import directly rather than reconciled at the end.