HPE Servers
507284-001
300GB SAS hard disk drive - 6Gb/sec transfer rate, 10,000 RPM, 2.5-inch small form factor (SFF)
New Factory Sealed Cisco HPE Aruba Huawei and Fortinet Hardware Shipped Worldwide
Solution
Compute and capacity that racks and boots on the first attempt
A server that arrives without rails caddies or the right controller is not a server yet. Configuration is confirmed line by line before anything is packed.
Process
Part Number Decode
Every line of the configuration decoded and confirmed against what the project needs
Compatibility Check
Drives and shelves matched to the target array model and firmware level
Accessory Completion
Rails caddies controllers and cabling added so the rack build is complete
Bench Verification
Powered up firmware reported and inventory captured where the order calls for it
Consignment Packing
Chassis and accessories shipped together against one packing list
Spares Definition
Failure prone parts identified and held against the same part numbers
Relevant Products
Related Products
HPE Servers
300GB SAS hard disk drive - 6Gb/sec transfer rate, 10,000 RPM, 2.5-inch small form factor (SFF)
HPE Servers
600GB hot-plug dual-port SAS hard disk drive - 6Gb/s transfer rate, 10,000 RPM, 2.5-inch small form factor (SFF) - For use with Ge
HPE Servers
HP 1TB 6G SAS 7.2K rpm SFF (2.5-inch) Dual Port Midline 1yr Warranty Hard Drive For Use with Gen7 or Earlier Models S-ERVER
HPE Servers
HP 1TB 6G SAS 7.2K rpm SFF (2.5-inch) Dual Port Midline 1yr Warranty Hard Drive For Use with Gen7 or Earlier Models S-ERVER
Where It Applies
Industry
Data Center
Top of rack aggregation and compute delivered in phased increments
Industry
Healthcare
Resilient access for clinical systems and connected medical devices
Project Case
Hosting Provider Repeatable Node Build
Comparison Article
New Versus Refurbished Network Hardware What Actually Changes
Send the list as it stands. The review is where most supply risk gets removed and it costs nothing
No forms No sign up Replies within one working day
FAQ
At the bill of materials rather than at the purchase order. Most of the value is in what gets caught before anything is committed.
A straightforward list is reviewed within a working day. Programmes with licence tiers and long lead items may take two.
We say so and propose the successor or an equivalent with the differences stated plainly rather than substituting quietly.
Yes. Staging against your programme calendar is normal on multi site work and avoids paying to store hardware you cannot install yet.
Yes. Serial lists commercial invoices packing lists and certificate packs in the format your client or auditor requires.
No. The same review applies to a single unit and to a multi wave programme although the staging and forecasting elements only matter at scale.