Skip To Content

New Factory Sealed Cisco HPE Aruba Huawei and Fortinet Hardware Shipped Worldwide

Solution

Campus Wireless Deployment

Take a wireless survey from design to installed coverage

A survey specifies a model a mount and a regulatory domain. Supply that differs on any of the three turns an approved design into a site problem.

Process

The Six Steps We Work Through

  1. 01

    Design Review

    Survey output checked against currently available models before the bill of materials is fixed

  2. 02

    Domain Control

    Regulatory domain matched to the destination country and confirmed in writing

  3. 03

    Accessory Match

    Mount kits antennas and injectors selected against the actual ceiling and cabling

  4. 04

    PoE Budget Check

    Switch PoE budget reviewed so radios run at full power rather than reduced mode

  5. 05

    Kit Packing

    Radios and accessories packed per building so the install crew works from one carton

  6. 06

    Spares Allocation

    Spare radios supplied in the same domain so any unit adopts anywhere

Related Products

Frequently Supplied Under This Solution

JW186A HPE/Aruba Access Points

HPE/Aruba Access Points

JW186A

JW186A is the Aruba AP-325 802.11n/ac 4x4:4 MU-MIMO Dual Radio Integrated Antenna AP. Multifunctional 320 series wireless APs prov

JW325A HPE/Aruba Access Points

HPE/Aruba Access Points

JW325A

JW325A is the Aruba Instant IAP-325 (RW) 802.11n/ac Dual 4x4:4 MU-MIMO Radio Integrated Antenna AP. Multifunctional 320 series wir

JW795A HPE/Aruba Access Points

HPE/Aruba Access Points

JW795A

JW795A - HPE Aruba AP314 Series Access Points Aruba AP-314 802.11n/ac 2x2:2/4x4:4 MU-MIMO Dual Radio Antenna Connectors AP

Start with a Bill of Materials Review

Send the list as it stands. The review is where most supply risk gets removed and it costs nothing

No forms No sign up Replies within one working day

FAQ

Campus Wireless Deployment Questions

Where Does This Process Start

At the bill of materials rather than at the purchase order. Most of the value is in what gets caught before anything is committed.

How Long Does the Review Take

A straightforward list is reviewed within a working day. Programmes with licence tiers and long lead items may take two.

What If a Line Is Discontinued

We say so and propose the successor or an equivalent with the differences stated plainly rather than substituting quietly.

Can Deliveries Be Staged

Yes. Staging against your programme calendar is normal on multi site work and avoids paying to store hardware you cannot install yet.

Do You Provide Documentation for Audit

Yes. Serial lists commercial invoices packing lists and certificate packs in the format your client or auditor requires.

Is There a Minimum Project Size

No. The same review applies to a single unit and to a multi wave programme although the staging and forecasting elements only matter at scale.

Chat on WhatsApp